Heat pump installationProcess, cost and timeline
BRL-100 and F-gas certified installation. Hybrid in 1 day, all-electric in 1–2 days. ISDE subsidy up to €3,275 handled for you.
Professional heat pump installation
Heat pump installation requires both BRL-100 accreditation(mandatory for heat pump installers since 2024) and F-gas certificationfor working with refrigerant. We have both.
For each home we tailor the system to your specific situation: insulation, existing heating system and energy use. Both hybrid (alongside your boiler) and all-electric (full gas replacement) are options.
What's included?
How the installation works
Free consultation
We assess your home, insulation and heating system.
Quote + subsidy
You receive a quote including ISDE calculation.
Installation
Hybrid: 1 working day. All-electric: 1–2 days.
Commissioning
Heating curve tuning and explanation of controls.
BRL-100 + F-gas certified
Heat pump installation is regulated. We hold both required certifications:
- BRL-100: mandatory installer accreditation since 2024 for heat pumps
- F-gas certification: legally required for handling refrigerant
Frequently asked questions
How long does heat pump installation take?+
Hybrid: 1 working day. All-electric including buffer tank: 1–2 working days.
Do I need to be home?+
Yes, for handover and explanation. The work itself does not require your continuous presence.
What permits are required?+
For single-family homes usually none. For apartments in protected views or HOAs there may be requirements. We advise during the consultation.
Do you also handle the ISDE subsidy?+
Yes, fully. We complete the application and the amount is paid directly into your account.